Global Footprint
Success Cases
Middle East Export Project
Full-scale deployment of 1600mm Corrugated Wall Production Line. Installation and performance testing successfully finalized.
Southeast Asia Facility
Integration of singular-flow automated radiator lines with Siemens PLC control. Achieved 7m/min production efficiency.
Central Asia Industrial Park
Commissioned dual-head TIG welding corrugated fin machines for a high-voltage transformer manufacturer.
Jiangsu High-Tech Grid
Automated spot welding reinforcement line setup. High-precision welding output with 0.1mm accuracy verified.
North China Production Base
Full assembly of radiator production lines including decoiler and roll forming units. Daily output capacity doubled.
European Compliance Project
Customized 1300mm corrugated wall equipment meet CE standards. Finished product pressure testing: Zero deformation.